Job completed for Fort Worth Christian School

Completion date: August 5, 2021

Location: North Richland Hills, TX

Why did the customer contact us?

We had been previously called out to do a fiber repair after a drainage company had dug through a fiber line connecting two buildings but now we have been called a second time because a playground equipment installation company drilled through our previously repaired fiber.

Solutions provided:

The customer had has come out again to pull a new fiber between these two buildings into the new conduit that was installed much deeper underground. The school has also marked the path of this new conduit and fiber for future reference. The problem in the past is they did not know the exact path the previous fiber went. The project went very smoothly and the only challenge was that the conduit contractor did not complete his installation to a wall mount box so we purchased all the materials to connect the new conduit to a wall mount box and then piped it over to the existing pathway into the building. We installed 6 strand multi-mode fiber optic cable between the two buildings. All cable was tested and certified as well. The customer was happy about our work and is now talking to us about additional projects to their new baseball stadium.

Team members on this project:

Clint Polley, Jose Garcia,

Photos & Videos:

[No Description]
Large View Icon
[No Description]
Certifying Fiber Optic Cable
Large View Icon
Certifying Fiber Optic Cable
10G Fiber in conduit
Large View Icon
10G Fiber in conduit
Unfinished Conduit
Large View Icon
Unfinished Conduit
Completed Conduit
Large View Icon
Completed Conduit
Fort Worth Christian
Large View Icon
Fort Worth Christian

Fields with (*) are required.